出版社:中國電力出版社 ISBN:9787508382067 版次:1 商品編碼:10418611 品牌:中國電力出版社(zhongguodianlichubanshe) 包裝:平裝 開本:大32開 出版時間:2009-03-01 用紙:膠版紙 頁數:18 字數:17000 正文語種:英文 作者:中華人民共和國國家發展和改革委員會發布
" 內容簡介 《DL/T 5198-2004水電水利工程岩壁梁施工規程(英文版)》規定了地下洞室岩壁梁部位開挖方法、岩壁梁錨杆和岩壁梁鋼筋混凝土施工,以及對岩壁梁的保護、載荷試驗和觀測方法等。為了規範岩壁梁的施工,保證工程質量與安全,特制定了《DL/T 5198-2004水電水利工程岩壁梁施工規程(英文版)》。 目錄 Foreword 1 Scope 2 Normative References 3 General 4 Excavation of Anchored Girder Area 5 Construction of Anchor Rods in Anchored Girder 6 Concrete Construction for Anchored Girder 7 Protection and Monitoring for Anchored Girder 8 Load Test and Monitoring for Anchored Girder Appendix A (Informative Appendix) Determination of Excavation Elevation of Plane for Layer of Anchored Girder Appendix B (Informative Appendix) Excavation of Protective Layer for Anchored Girder Appendix C (Normative Appendix) Adjustment Calculation of Hole Positions for Anchor Rods of Anchored Girder 查看全部↓ 精彩書摘 8.0.1 The aim of load test for anchored girder is to checkthe bearing capacity and construction quality.The test includes static load test and dynamic load test. 8.0.2 Before the load test of rock wall,the test outline shall be worked out.Its contents include the grade of static and dynamic loads,test method,the layout of observation cross sections and instruments,the alarming and control values of instruments,data records and dataanalysis,etc. 8.0.3 The load test of anchored girder and the load test of bridgecrane shall be carried out simultaneously and the load grades may bedetermined according to the test requirement of the bridge came ordesign requirement. 8.0.4 Before test,the embedded instruments shall be checked toconfirm they are in normal operation condition. 8.0.5 When conducting the load test of anchored girder,reliablecommunication shall be available among the observer commandpersonandtheoperatorofthebridge crane. 8.0.6 During load test of anchored girder,the test shall be stoppedwhen the observation values of the stress meters,displacement metersand multi-point displacement meters reach or exceed the correspondingalarming and control values,and the test Can be continued only afterthe reasons have been ascertained and proper measures have beentaken. 8.0.7 During load test of anchored girder,blasting shall not be. 查看全部↓ 前言/序言 Foreword This standard iS established according to the requirement of Notice on Confirming the Plan Project to Establish and Revise the PowerIndustrial Standards in 1999,with the reference No.22 Power(2000).the paper issued by the former Power Department of State Economic and Trade Commission. The crane girder anchored to rock wall is called as anchored girder for short,which is the supporting structure for the heavy bridge cranes and is suitable for underground powerhouse,main transformer chamber,tailrace gate chamber and caverns for other purposes in hydropower station.The anchored girder is different from the crane girder supposed on the horizontal rock bench or on the reinforced concrete column.The anchored girder is a kind of load-bearing structures and bears the load by two groups of tensile anchor rods and a group of compressive anchor rods to anchor the reinforced concrete girder on the incfined rock face.In 1980s,the anchored girder then already applied more widely in the North European countries,such as Norway,was introduced into the underground powerhouse of Lubuge Hydropower Station in China.Afterwards it was successfully used in the underground powerhouses of Guangzhou Pumped Storage Power Station(Phase I and Phase II),Tianhuangping Pumped Storage Power Station,as well as Xiaolangdi,Dachaoshan and Mianhuatan Hydropower Stations and SO on.The anchored girder has advantages such as economy,reliability,easier construction,speed up construction progress,reduction of powerhouse span and advanced service etc.At present,this new technology has been applied widely in China. 查看全部↓
" |