![](/c49/99/12704921.jpg)
出版社:中國電力出版社 ISBN:1551981970 版次:1 商品編碼:12704921 品牌:中國電力出版社(zhongguodianlichubanshe) 包裝:平裝 外文名稱:Specification 開本:32開 出版時間:2020-06-01 用紙:膠版紙 頁數:48 字數:48000 正文語種:英文 作者:國家能源局
" 編輯推薦 DL/T 5742—2016 水電水利地下工程施工測量規範(英文版) 內容簡介 This specification is formulated to unify the technical requirements for and ensure the quality of hydropower and water resources underground works to meet the needs of underground construction. This specification is applicable to construction survey of hydropower and water resources underground works. This specification uses the root mean square error (RMS error) as the measure of construction survey accuracy, and uses the two times RMS error as the tolerance. A sound quality assurance system shall be established, and all survey activities shall observe the requirements stated in the quality assurance system documentation. The survey organization or professionals engaged in the underground works construction survey shall possess the appropriate qualification certificates. The survey crew shall observe a set of rules and criteria that are compliant with DL/T 5173 Specification of Construction Survey in Hydroelectric and Hydraulic Engineering. The survey crew shall design and optimize the construction survey methodology according to the specific drawings, topographic and geologic conditions. 作者簡介 本規範由中國電力企業聯合會提出。 本規範由電力行業水電施工標準化技術委員會歸口。 本規範主編單位:中國葛洲壩集團股份有限公司 中國長江三峽集團公司 本規範主要起草人員:晏春波 楊國興 羅琛 邱章雲 唐億階 楊生春 雷勇 劉宇簽 馮昌幸 孔令紅 劉運兵 陳光焰 王義兵 陳桂華 張志偉 本規範主要審查人員:梅錦煜 席浩 許松林 汪毅 宗敦峰 李志謙 吳新琪 楚躍先 周厚貴 郭光文 孫來成 鄭桂斌 吳國如 吳義航 餘英 王文濤 吳高見 向建 張祖義 朱鏡芳 陳振華 朱明星 呂芝林 康明華 陳宏 目錄 1 General Provisions
2 Terminologies
3 Horizontal Control Survey 3.1 Ground Horizontal Control Survey 3.2 Underground Horizontal Control Survey
4 Vertical Control Survey 4.1 Ground Vertical Control Survey 4.2 Underground Vertical Control Survey
5 Connection Survey 5.1 General Requirements 5.2 Horizontal Connection Survey 5.3 Vertical Connection Survey 5.4 Data Processing
6 Breakthrough Survey 6.1 General Requirements 6.2 Design and Estimate of Breakthrough Errors 6.3 Measurement and Compensation of Breakthrough Deviation 6.4 Data Processing
7 Excavation Works Survey 7.1 Excavation Survey 7.2 Supporting Survey 7.3 Data Processing
8 Concrete Works Survey 8.1 General Requirements 8.2 Concrete Works Survey 8.3 Embedded Structure Works Survey 8.4 Data Processing
9 Deformation Survey During Construction 9.1 General Requirements 9.2 Convergence Monitoring 9.3 Crown Settlement Monitoring 9.4 Surface Settlement and Base Slab Heave 9.5 Data Processing
10 As-built Survey 10.1 General Requirements 10.2 As-built Section Survey 10.3 Concrete Structure Shape Survey 10.4 As-built Survey for Embedded Structure Works 10.5 Data Processing
Explanation of Wording in This Specification List of Quoted Standards 查看全部↓ 前言/序言 This specification is developed according to the requirements of Document GNKJ (2012) No. 326 Notice on the Preparation and Revision Plan for the second batch of Energy Industrial Standards in 20/2 issued by National Energy Administration. In preparing this specification, the drafting team has held special panels, analyzed and summarized the best practices in the field of construction survey for underground works, collected and reviewed the literatures and data concerned and sought inputs and comments from a wide range of experts and organizations. This specification mainly covers: horizontal control survey; vertical control survey; connection survey; breakthrough survey; excavation works survey; concrete works survey; deformation survey during construction; and as-built survey. 查看全部↓
" |